Founder-led management consulting

Luna SolGroupOperator-led transformation
Local site index

What decision are you trying to move?

Suggested starting pointsUse ↑ ↓ and Enter
Curated index · no query leaves this browser
Start a conversation
Luna Sol GroupManagement consulting
Start a conversation →Founder-led · Confidential · Evidence-aware
Flagship product · Executive Operations Studio

Run the operating week before it runs you.

A working control system for the decisions senior operators are hired to own: capacity, service, portfolio value, cross-functional execution, and weekly performance control.

Product modules
3Control Tower · Portfolio · WBR
Data path
CSVImport · local state · export
Decision horizon
13 wkAdjustable from 4 to 26 weeks
Black-box scoring
0Every formula is published
  • No signup
  • Local working state
  • Downloadable artifacts
  • Transparent assumptions

Working dataThe studio opens with demonstration data. Imported CSV data and edits persist only in this browser until the visitor resets the studio or clears local storage.

Product boundaryThe studio structures capacity, portfolio, and weekly-review decisions. It does not validate source data, authorize financial commitments, or replace accountable executive judgment.

Loading working state
Operations Control Tower

Convert demand, capacity, quality, and backlog into a controlled 13-week plan.

Scenario assumptionsEditable · deterministic
Executive control viewWatch
Capacity coverage100.7%Effective output ÷ scenario demand
Weekly backlog burn+605.8Positive reduces the active queue
Target timing32 wksAgainst 5K target
WIP exposure · wk 13$109,652Ending backlog × handling cost
Backlog trajectory24K16.1K
1481213
Week number · hover for projected units
Decisions the model surfaces
  1. Secure 855.8 additional effective units per week to hit the target inside the horizon.
  2. A one-point productivity gain creates approximately 931.1 units of weekly output.
  3. A one-point quality-yield gain returns approximately 897.7 units of weekly output.
Active control alerts
  • Capacity buffer is 0.7%; the operating guardrail is 5%.
  • The backlog target misses the 13-week planning horizon.
  • Quality yield is below the 98% control threshold and is consuming effective capacity.

Model boundary: The forecast assumes stable weekly demand and effective output across the selected horizon. It deliberately excludes mix, shift calendars, hiring lead times, and site-level constraints until operating data is imported and validated.

Not a portfolio claim.
An inspectable operating mechanism.

The studio turns the capabilities normally buried in a résumé into a working system a COO, transformation leader, or hiring panel can interrogate directly.

01

Self-service operating analytics

Import a weekly CSV, reconcile demand and effective capacity, and expose the gap before it becomes a customer or cost event.

02

Capacity and scenario planning

Model demand shock, productive utilization, quality loss, flex capacity, backlog burn, and target timing over a 13-week horizon.

03

Portfolio and benefits governance

Challenge value, investment, confidence, readiness, urgency, and delivery risk inside a visible prioritization rule and funding envelope.

04

WBR operating mechanisms

Convert KPIs into thresholds, trend signals, named owners, decisions, due dates, and an exportable executive review memo.

05

Business-to-technical translation

The import schema, calculation logic, state model, and outputs make the product requirements inspectable instead of merely described.

06

Data ownership by design

The working state remains on the visitor’s device. No operating data is transmitted by the studio, and every output can be exported.

The demo is generic. The operating architecture should not be.

Luna Sol adapts the data model, decision thresholds, owners, integrations, and review cadence to the way your operation actually creates value and risk.